Integrated Installation for a Happy Customer

Another successful installation recently completed in SW16 for a private client with a desire to have the hoist tracking as discreet as possible. After a visit to our Education Center in Enfield during the planning stages it was decided to integrate the hoist rails into the ceiling as much as possible.

Bedroom combination into Bathroom:Integrated Rails Bedroom 1sml

CombiLock @ Sliding Doorway 1sml

 

 

The fully automatic Guldmann Combi Locks allow smooth simple transfers between rooms.

 

 

 

 

Elsewhere a simple mono rail track gives access to the changing bench in the ground floor  WC/changing  room.

Integrated Mono Rail @ Sliding Doorway 1sml

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

An XY system in the living area allows the family to enjoy time together .  Integrated Rails Living Area 1sml